Heavy Electrical Complex |
| Status |
Heavy Electrical Complex (Private) Limited (HEC) was incorporated as a private
limited company on 09 December 1991 under Companies Ordinance, 1984. HEC is
fully owned by State Engineering Corporation (SEC), Ministry of Industries and
Production, Government of Pakistan. The Company is engaged in manufac turing
of power transformers. The registered office of the company is situated at
House # 1C, Street # 20, Perveen Shakir Road, F-7/2, Islamabad.
PROJECT LOCATION
The project is located at Hattar Industrial Estate - Hattar, District Haripur,
NWFP at a distance of 66 Km from the countrys capital, Islamabad. The site
has natural gas and electricity supplies, railway track and telephone
facilities. Skilled manpower is also available in the region due to location
of Heavy Engineering Industries nearby at Taxila and Wah.
The site is bounded as follows:
East : Plot No. 60-63
West : Taxila Haripur Railway line
North : Khanpur distributory No. 3
South : Road No. 6
DESIGNED CAPACITY
HEC is one of the industrial units of State Engineering Corporation (SEC)
engaged in the manufacturing of power transformers of different types (total
annual capacity 3000 MVA) with primary voltage rating of 66 and 132 KV. In
addition, the HEC undertakes repair and refurbishment of old and damaged
transformers upto 500 KV. HEC has six main manufacturing shops namely machine
shop, winding shop, core shop, fabrication shop, insulation shop and assembly
shop. In addition, HEC has an oil purification shop, high voltage test
laboratory equipped with 250 ton overhead traveling crane. HEC can diversify
its manufacturing range by including other products such as instrument
transformers, high voltage circuit breakers and other grid stations equipped
for meeting demand of the products in domestic and foreign markets.
PRODUCTION
HEC was set up in technical collaboration with manufacturers of international
repute, to manufacture electrical equipment mainly used in 132KV and 66KV
sub-stations and grid-stations of high voltage power supply systems. Most of
the machinery is from China, Germany and Switzerland.
HEC started its trial production on 07 November 1994 whereas the commercial
operations were started in March 1997.
Present status of the land is as under:
|
Total Area (Acres) |
Factory (Acres) |
Covered Area |
(Acres) Main Workshops (Sq M) |
Ancillary Facilities (Sq M) |
|
| Leasehold land for 99 years | 81 | 43 | 6.278 | 15,758 | 4,368 |
FINANCIAL STATEMENTS
Comparative balance sheet and profit and loss account for the period from 01
July to 1999 to 31st December 2009 are given in
Annexes A and B
respectively.
| Key Contacts |
|
q
Director General
|
|